Material Requirement Calculator

Project dimensions se cement, paint, tiles, bricks — kisi bhi material ki required quantity aur cost nikalein.

Length (m)
Width (m)
Height / Thickness (m)
Wastage / Buffer
%
Wastage
Buffer
0%
Total Estimated Cost
$0
0 materials
Project Area 0 sq.m
Project Volume 0 cu.m

Bill of Materials

Har material ki required quantity (wastage included) aur estimated cost.

MaterialBasisRequired QtyCost
Total Cost$0

Formula kaise kaam karta hai

Required Qty = Consumption Rate × (Area ya Volume) × (1 + Wastage%)
  • Area = Length × Width — flooring, tiles, paint, plaster jaise materials ke liye
  • Volume = Length × Width × Height/Thickness — concrete, sand, cement jaise materials ke liye
  • Har material apni Consumption Rate (per sq.m ya per cu.m) use karta hai — jaise "0.4 bags cement per sq.m plaster"
  • Wastage Allowance project ke dauran material loss/cutting waste cover karne ke liye add hoti hai (typically 5–10%)
  • Cost = Required Quantity × Unit Cost (agar diya gaya ho)

Note: Default consumption rates general estimates hain — actual rates material brand, application method aur surface ke hisaab se vary karte hain. Bara project shuru karne se pehle supplier/contractor se confirm karein.