MILITARY
Tactical Planning Calculator
Mission timeline · Force allocation · Logistics · Risk · Operational planning
timeline
force mgt
Mission parameters
soldiers
units
km
km/h
Average tactical movement speed
hr
Time spent at objective
score
score
score
score
Tactical planning
- T_m = D / V movement time (hr)
- T_total = T_m + T_on + T_m + 0.25×T_m total mission time
- F_req = f(P, T, W, L) force requirement
- Risk = weighted factors operational risk
Total mission time
10.5
hr
Risk level
HIGH
Force required
135
soldiers
Mission timeline
Move
Action
Extract
Duration: 10.5 hr
Force allocation
Assault
70
%
Support
20
%
Reserve
10
%
Logistics vehicles
3
vehicles
Risk factor breakdown
mitigation
Threat
8.0
Terrain
4.0
Weather
6.0
Logistics
3.0